The following project deliverables have been completed and are available from UDFCD.
Deliverable
Release Date
End Review Date
Download Deliverable
Phase A--Development of Alternatives      
Baseline Hydrology (Draft) 01/27/2010 03/04/2010 Baseline Hydrology (Draft)
Baseline Hydrology (Final) 04/16/2010 04/16/2010 Baseline Hydrology (Final)
Development of Alternatives (Draft) 12/29/2010
01/31/2010
Alternate Plans (Draft)
Cost/Benefit Analysis (Draft)      
Alternative Report (Final) 09/08/2011   Alternative Report
Phase B Conceptural Design      
Conceptual Design Report (Draft) 11/11/2011 12/14/2011

Conceptual Design Report (Draft)
Maps
Profiles

Conceptual Design Report (Final)      
FHAD      
FHAD Flood Maps and Profiles (Draft) 04/27/2010   See Draft FHAD Report
FHAD Report (Draft) 08/19/2010  

FHAD Report (Draft)

FHAD Report (Final)      
FIRM Information Development